Schedule Management
Schedule Management:
Login to the Casting Director account
Open the desired active project
Click on the “Schedules” tab
Click on the “Edit Schedule” button to modify the desired schedule
Double-click on the talent remove them from the schedule and move them to unscheduled column on the right-hand side of the page
Click and drag the talent (up or down) to move them into a different time slot on the schedule
Click on the Green “Send Times” button to send out schedule changes to the affected talent
Comments
0 comments
Article is closed for comments.